service

SERVICE

STRUCTURAL PLAN
Structural type, frame planning, foundation method

business_img01.jpg

business_img02.jpg

EARTHQUAKE-RESISTANT STRUCTURAL DESIGN
Structural design of earthquake-resistant structures
SEISMIC ISOLATION STRUCTURAL DESIGN
Structural design of seismic isolated buildings with seismic isolation members

business_img03.jpg

business_img04.jpg

VIBRATION CONTROL STRUCTURAL DESIGN
Structural design of vibration control buildings with vibration control members
EARTHQUAKE RESPONSE ANALYSIS
Analysis and prediction of buildings against earthquakes by dynamics

business_img05.jpg

business_img06.jpg

STRUCTURAL MANAGEMENT
Checks whether the construction is in accordance with the structural drawings, and reports to the contractor.
BUILDING INFORMATION MODELING(BIM) CREATION
Creating data that can be linked between designs, structures, and equipment

business_img07.jpg

business_img08.jpg

STRUCTURAL DIAGRAM CREATION
Creation of structural diagrams of earthquake-resistant, seismic isolated, and vibration control buildings

DESIGN ACHIEVEMENT MAP(2005年〜)

Seismic isolation building 21 buildings(Marking
Certification of Minister
of MLIT
31 buildings(Marking
Seismic isolation (Height 60m or less) 18 buildings
High-rise buildings (Earthquake-resistant structures, Height over 60m)
(Vibration control, Height over 60m)
(Seismic isolation, Height over 60m)
4 buildings
1 buildings
8 buildings
Reinforcement with Vibration control 16 buildings(Marking
Chimney,etc.Certification of Minister of MLIT 4 buildings(Marking
Evaluation of design seismic motion
Foundation design
3 cases
1 cases
認定建物の設計実績MAP

BUILDING INFORMATION MODELING(BIM)

Systems Software: Autodesk AEC Collection(REVIT2019) 8
Hardware: Workstations(Desk top) 8
Hardware: Workstations(Lap top) 1
Organization and
personnel
BIM promotion technician 1 person
Work staff 7 peple
BIM stages
Stage1
Produce documents of Structural Drawing (Floor diagram, Frame diagram, Lists of Columns and Girders)
Stage2
Aggregations of skeleton quantity, Examination of fitting of members
Stage3
Creating data that can be linked between designs, structures, and equipment
Stage4
Provide sufficient accuracy BIM data for effective use to construction or maintenance
FORZA001キャプチャ
FORZA002キャプチャ
躯体の梁貫通孔の確認
設備配管・エレベーターと構造躯体の干渉確認